Impeccably designed and well-designed drainage will collect and divert groundwater from the site. It will protect the foundation from premature destruction, ensure normal growth of cultivated plants. In order to ensure spontaneous drainage of the collected water system, it is necessary to ensure the slope of the drainage pipe. And his device needs accurate information, right?
You will learn all about the angle of drainage pipes and how to properly organize the drainage system from our article. Following our technical recommendations, you can design and accurately calculate the drainage network. The basis for the data are construction standards.
To help independent masters, the technology of designing a water drainage system is described in detail, the specifics of calculating and laying its components are thoroughly analyzed. For a clear perception of information attached photos and videos.
Design features of drainage
There are three types of drainage systems, each of which has its own design features: horizontal, vertical, combined.
The working elements of horizontal drainage can be:
- tubular drains;
- gallery drains;
- trays and trenches.
The system of drainage pipes in combination with a filtering dusting (multilayer) - this is a tubular drain.
A multilayer filtering dusting, in this case, is done in order to prevent leachable soils from entering the system. By standards, the drainage circuit is always equipped with manholes.
For the organization of the drainage system of a construction object (site), different schemes can be used. The specific choice depends on the geological conditions of the area, on the intensity of precipitation and other factors
Unlike tubular drains, gallery drains are arranged from pipes of a larger cross section. On the walls of the pipes there are openings for collecting waste.
The process of arranging gallery drains also involves sprinkling with additional filtering with geotextiles.
Sectional tubular drain. It is by this principle that tubular and gallery drains are installed in modern housing construction projects. Compliance with standards and accuracy of calculations guarantee high efficiency of drainage systems
A drainage system with trays and trenches is usually done in such conditions when the groundwater level is allowed up to the level of 1.3-1.5 m. On stable soils, trenches are performed with slopes, on unstable soils the trenches are reinforced with reinforced concrete structures.
The vertical drainage system consists of a set of wells (wells) connected by a reservoir. A sewer is discharged through a collection line using a pumping station. Also, drainage on vertical drainage can be carried out by discharge into the lower layers of the soil.
The combined drainage system combines horizontal and vertical schemes. It is characterized by specialists as a complex drainage scheme and is usually arranged in areas where highly efficient drainage of soils is required.
Image Gallery
Photo from
Laying drainage and sewer pipes
Drainage system around the foundation of the house
Sewer manholes
Gasket drain to the absorbing well
Surface and depth diagrams
Based on the calculated parameters of the drainage deepening, distinguish between surface and deep drainage schemes. The purpose of the surface scheme is the collection and removal of precipitation products, as well as closely occurring groundwater.
The purpose of the in-depth scheme is to reduce the level of groundwater, their collection and diversion beyond the boundaries of the site where the construction site is located.
An example of a surface drainage system device. Surface drainage is widespread in private housing construction. The system of collection and removal of precipitation products is necessary for each case of construction of residential buildings
The scheme of water receivers of storm sewer systems supports point or linear execution. In the first case, sewage is diverted from local sources (gutters, sidewalk pits, collections of entrance groups).
The linear scheme provides water drainage throughout the facility. As a rule, a combined solution with the implementation of both schemes is used at residential construction sites.
Deep drainage is mandatory in almost all cases of private housing construction and improvement of economic plots. This is an effective protection of those elements of building structures that are located below the zero level (foundation, basements, plant root system).
To exclude the construction of deep drainage is permissible on hills where the groundwater level does not exceed the level of 1.5 m, where effective drainage of the soil is noted.
Fragment of a scheme for laying deep drains. Typically, such schemes include the placement of drainage wells - at least one for every 30 meters of the length of the highway. On straight sections, installation intervals of 50 meters are allowed
Designing a deep drainage scheme requires high precision calculations. Even a small calculation error can cause a low system efficiency.
The practice of installing such circuits often indicates a common mistake - an inaccurate calculation of the depth of the drain tab. The result is uneven water drainage from the site or, even worse, flooding of fertile land and basements.
There are other articles on our site where we examined in detail the construction of various drainage options. We recommend that you familiarize yourself with them:
- Drainage device around the house: design and installation of a drainage system with your own hands
- How to make your own foundation foundation house drainage: the secrets of proper organization
- How to properly do the drainage of the garden site with your own hands: we disassemble the correct arrangement technology
Calculations and drainage construction standards
The estimated values that will be required for the construction of a drainage system, as a rule, are:
- diameter of pipelines;
- pipeline laying level;
- pipe slope values;
- density geotextile filter.
And more about each item.
Value # 1 - design diameter of pipelines
The required diameter of the pipelines is calculated with emphasis on the design parameters of the intensity of water disposal.
For private housing construction, pipes with a diameter of 100 mm are usually optimal. Their standard throughput is about 7 l / s, which is fully consistent with design standards in most cases.
Meanwhile, increasing the diameter of the drain allows you to cover a large working area, to strengthen the efficiency of the system.
Value # 2 - system bookmark depth
The level of laying of drainage pipelines, according to existing standards, is determined taking into account two criteria:
- The level of freezing soil.
- Depth of foundation.
The degree of soil freezing is directly related to the climatic properties of the area. Therefore, for each individual territory, this parameter may differ.
But in any case, the calculation of the laying depth of drainage pipes is carried out from the end point of freezing of the soil with the addition of at least 300-500 mm of additional deepening to this value.
One of the important design parameters of deep drainage is to determine the degree of soil freezing at the site of the facility. Based on the calculated soil freezing data, calculate the depth of the laying of drains
Using the same algorithm, the foundation drainage is calculated, but from the end point of the foundation.
Value # 3 - slope of drainage pipes
Under what slope to mount the pipes of the drainage system, SNiP standards clearly indicate. According to these standards, the minimum values of the drainage slope must be taken with the allowable minimum flow rate of the wastewater into account.
In addition, it is stipulated that for pipes with a diameter of 150 mm the minimum allowable slope should be at least 8 mm per meter of length, and for pipes with a diameter of 200 mm - at least 7 mm per meter of length. In certain sections of the networks, it is allowed to underestimate these parameters to 7 mm and 5 mm, respectively.
The permissible maximum slope of the drainage pipes per meter length is 150 mm. More than this value, allowable slope only on the branches from plumbing fixtures with a branch length of up to 1.5 m.
In uncreated drain areas where pipes with a diameter of 40-50 mm are used, a slope of up to 30 mm per meter of length is permissible. And for pipes with a diameter of 85-100 mm and under the same conditions, the slope level can be made no more than 20 mm per meter length.
The slope of the pipelines that make up the drainage system also refers to the main design parameters. Compliance with slope standards is a guarantee of creating a drainage system that will work productively - to collect and divert water from the site
If trays are used as drainage elements, the slope level is taken with an eye to a sink rate at which the self-cleaning effect of the liquid is ensured. Permissible filling of the trays is not higher than 80% with a tray width of at least 20 mm.
The value of the width of the trays is calculated based on the results of hydraulic calculations and depends on the design features of the elements. However, if the height of the tray is greater than 50 mm, the width value cannot be less than 70 mm.
Image Gallery
Photo from
The formation of a slope is a prerequisite in the construction of gravity underground systems draining ground and atmospheric water, as well as liquid drains treated in septic tanks
The slope must be arranged along the entire gravity free-flow system: both at the water collection site and at its transportation to the unloading points
Storm sewer pipes transporting rainwater to a collector or an absorption well must also be biased
The choice of slope created by the drainage route depends on the diameter of the pipeline and the type of soil
If drainage is arranged to drain the soil-vegetable layer, the thickness of which usually does not exceed 40 cm, the slope should be at least 0.01. It is believed that the drainage system should not completely drain water from the roots of plants
For the installation of a drainage system in loamy soils, the slope should be 0.001. This rock is practically not able to pass water through its thickness into the underlying layers
When laying the drainage system in sandy soils, the slope should be 0.003, in sandy loam 0.002
The depth of entry of drainage pipes into the collector and absorbing wells is determined on the construction site in fact. Pipe holes are drilled according to actual input
Drain pipe with geotextile sheath
Absorbing well for stormwater and drainage
Storm sewer inlet
Connection of a drainage pipe to a rotary well
Superficial drainage for drainage of the soil
Loamy trench for drainage
Sand Drainage Facility
Depth of input of drainage pipes into the collector
Value # 4 - required density of geotextiles
When the design of the drainage system involves the use of perforated corrugated pipes as drainage, it is recommended to use a geotextile filter sheath (geotextile) along with sprinkling such pipes.
The geotextile web acts as a filter element, prevents the clogging of the highway with small particles of soil. To obtain the maximum filtering effect, a calculation of the density of the geotextile filter is required. The optimal design value for household drainage systems is considered to be a density of 100-150 g / m2.
Features of installation of drainage on a slope
Drainage systems provide drainage due to the slope of the drains. It would seem that, provided the site is located on a slope, water should be diverted from the site naturally, and there is simply no need for a drainage system.
However, the situation in such cases is completely different, and the drainage of the site on the slope becomes the same relevant measure as for sites with a slope horizon of less than 8%.
The construction of private residential buildings on steep slopes is a common practice. Water does not stop on the slopes, but this fact cannot be considered a reason for refusing to build a drainage system
Of course, the drainage of territories on the slopes accompany their own characteristics. Often, the soil on steep slopes has a heterogeneous structure. Different horizons may have different levels of groundwater.
Therefore, it is often necessary to use combined types of drainage to ensure the necessary degree of drainage of the entire territory of the site.
Meanwhile, in the construction of drainage systems on slopes with a level of more than 8%, the standards allow the absence of drainage inspection wells.
System layout and order
The organization of drainage on a site with a slope level of more than 8% begins with geological surveys. Based on the results of surveys, aquifers and groundwater occurrence levels are determined. Based on the information received, a project is being developed for the drainage of the site on the slope, and construction work is underway.
Ultimately, the task of eliminating the possibility of soil erosion by a chaotic natural drainage due to the steepness of the slope should be solved.
In a simple version, this is done approximately like this:
- At the upper elevation of the site, the first horizontal surface drain is created.
- A second horizontal surface drain is created at the lower elevation of the site.
- Both drains are connected by perpendicular trenches.
- From the horizontal drain of the lower level, a drain is made into the drainage well.
If the landscape of the site has a stepwise complex shape and the project of the object provides for the construction of retaining walls, stairs, transitional areas, for each of the project elements it is necessary to construct point drainage systems that pass into the linear drainage system.
Large areas located on the slopes, as a rule, are equipped not with single surface drains, but with full-fledged herringbone-type water collection and removal systems.
The branched drain is located on the upper horizon and combines with the collector drainage circuit surrounding the construction site. From the circuit, the effluents are sent to a collection tank outside the site or to a storm sewer.
Diagram of a drainage device for an object built on a slope. Usually combined drains are built on the slopes, since the territory on the slope is traditionally distinguished by a complex relief
This circuit design is called ring drainage. Thanks to the construction of a protective circuit located around the perimeter of the facility, it is possible to take control of the groundwater level. In turn, the "herringbone" provides for the collection of water from the surface of the plot and its effective removal.
Installation of ring drains is carried out at some distance from the construction site. This factor allows you to build an annular drainage system directly at the stage of operation of household facilities.
It should be noted that the effectiveness of lowering the groundwater level within the inner part of the circuit directly depends on the following parameters:
- pipe deepening level;
- the depth of the galleries;
- depth of wells (if any).
The effectiveness of protection is also influenced by the dimensions of the circuit.
A few practical tips for laying drainage pipes will help you deal with the drainage device on your own in the countryside.
Protection of sites (territories) from oversaturation with moisture is an urgent task that has to be solved in almost every construction case. Existing drainage systems allow solving such problems.
The main point is to calculate and choose the option of a drain device that would be ideally suited in each particular case.
Are you planning to equip the site with drainage on your own, but have encountered difficulties at the design stage? Ask your questions in the comments section - we will try to help you.